GUDDU POWER PROJECT, 747MW

The transportation of equipment for the Guddu Power Project included a couple of Gas Turbines weighing 280 metric tonnes each. A side combination of hydraulic platform trailers were used in the transportation to save time and money.

HUBCO – NAROWAL PROJECT, 213 MW

Transportation of 11 MAN, Diesel Engines (dimensions 13.1 x 4.95 x 6.36 meters, weight: 320 tons each) and 11 Boilers (dimensions: 13 x 5 x 4.1 meters, weight: 87 tons each) for Hubco Narowal Project from Karachi Port / Port Qasim to Narowal. Distance: 1420 km.