GUDDU POWER PROJECT, 747MW

The transportation of equipment for the Guddu Power Project included a couple of Gas Turbines weighing 280 metric tonnes each. A side combination of hydraulic platform trailers were used in the transportation to save time and money.

HUBCO – NAROWAL PROJECT, 213 MW

Transportation of 11 MAN, Diesel Engines (dimensions 13.1 x 4.95 x 6.36 meters, weight: 320 tons each) and 11 Boilers (dimensions: 13 x 5 x 4.1 meters, weight: 87 tons each) for Hubco Narowal Project from Karachi Port / Port Qasim to Narowal. Distance: 1420 km.

AES LALPIR THERMAL POWER PLANT, 362MW & 365MW

Over 80,000 F.ton of cargo was transported for Mitsubishi Heavy Industries Ltd for their thermal power project. The equipment included 2 Stator generators (dimensions: 18 x 6.4 x 5.5 meters, weight: 325 ton each) and 2 transformers (dimensions: 10.5 x 3.5 x 4 meters, weight: 230 ton each). Custom clearance for the cargo was also done by us.

NISHAT POWER PROJECT, 2 x 195 MW

Transportation of Wartsila engines (dimensions: 13.66 x 4.09 x 6.00 meters, weight: 295 ton each) and 11 Boilers (dimensions: 13 x 5 x 4.1 meters, weight: 87 ton each) from Port Qasim to Chunnian site, near Lahore. Distance: 1320 km.

LIBERTY POWER PROJECT, 195 MW

Transportation of 3 Wartsila engines (dimensions: 13.66 x 4.09 x 6.00 meters, weight: 295 ton each) and 11 boilers (dimensions: 11 x 5 x 4 meters, weight: 73 ton each) from Port Qasim to Faisalabad. Distance: 1200 km.